Today marked the completion of my second studio project, the P.E. or "Poached Egg." This project was a direct corollary to our first project, "the RAW" where we analyzed an existing structure in terms of its generative aspects and overall goal.The above image is Deborah's and my RAW drawing of Carleton University's School of Architecture. We observed that the building is generated around an internal city grid with two main streets, side streets and alleyways. Offices and seminar rooms have addresses on the streets but more importantly, attached to the "armature" of the street system, were spaces we called "thresholds." In the Carleton University, the threshold spaces were places that allowed for multiple levels of commitment to an activity taking place in the building. The overall effect of this, we observed, was to encourage the interaction, improvisation, and cooperation that are key to the pedagogy of an architectural school.
The P.E. project was then to take the thesis we observed (threshold spaces) and make an installation in Rand Hall that worked on a 1:1 scale (human interaction) and an 1:x scale (modeling the building). Basically it has to transform our understanding of the site we chose as well as working as a 1ft equals whatever (1in, 1/2in, etc.) model of the building. It is hard to understand and even harder to design.
Deb and I went through several iterations and finally decided on a model that slid out from the wall (the street) and unfolded in planes (threshold spaces) to create a threshold space for our studio.
There were some challenges to working in pairs that we had encountered during the RAW project, however, by this point Deborah and I began to just sync. Last Saturday we were in the woodshop taking turns drilling and holding screws when Deborah remarked that we were like "figure skaters." I inquired if we couldn't be something cooler, less emasculating, like synchronized swimmers. She suggested the ultimate in cool, synchronized divers and despite the sarcastic nature of my question, I had to agree she was on to something.So team metaphor in place we built this Murphy bench and, at our review today, blew some minds when we pulled our model out of the wall, transformed it into a bench, sat down and gave the rest of our presentation from a newly created space in the building.








